How Long Does It Take to Design and Build an Exhibition Stall?
By the Solutions Events team ·
The short answer: start a custom exhibition stall three to four weeks before the show opens. A simple stall can be done in less, and a larger stall with a custom structure, LED walls or machinery on display needs more. The weeks below show what should be finished and when.
A working plan for a custom stall
Four weeks out: brief and floor plan
Send the show name and dates, your stall number and size or the floor plan, the organiser’s exhibitor manual, your logo and brand colours, and a list of what you are displaying. If you have a stall you liked at another show, send a photograph.
Three weeks out: 3D design approved
You receive the stall in 3D. This is the moment to change things, because a change on paper costs nothing and a change after fabrication costs time. Approve the design, the colours and the graphics wording. Any organiser approval of stall drawings should be applied for now.
Two weeks out: fabrication
Carpentry, painting, counters, flooring and 3D lettering are built. This is the longest stage, and the one that changes least if the design is final.
The final week: graphics, finishing and dispatch
Graphics are printed and fitted, lighting and screens are tested, and the stall is packed for transport. Confirm the hall’s set-up hours and the vehicle entry with the organiser.
Set-up days: install, light and test
The crew installs the stall, fits the lighting and screens and tests everything before the doors open. Your products arrive last, so that the stall is dressed once.
What slows a stall down
- Design changes after fabrication starts. Moving a counter on paper takes minutes. Moving it after it is built can take days.
- Artwork that is not final. Logos, product photographs and wording that arrive late hold up printing.
- Organiser approvals. If the show needs approved drawings, send them as soon as the design is agreed.
- Power requirements given late. The load for machinery, LED walls and lighting has to be applied for in advance.
- Short notice. A show that is closer than three weeks is not always impossible. Send the details and we will tell you what can be done.
How the timeline changes for a bigger stall
A pavilion for several exhibitors, a stall with a raised floor, or one that includes an LED wall or a working demonstration needs the brief earlier, because there is more to design, build and test. As a rule, the more custom the structure, the earlier it should be briefed.